Items where Year is 2011

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Uncontrolled Keywords | Item Type | No Grouping
Number of items: 23.

as constructed information

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 2 - Protected Entrance Halls

BCA technical guidance notes are for the benefit of it’s members and the construction industry, to provide information, promote
good practice and encourage consistency of interpretation for the benefit of our clients. They are advisory in nature,
and in all cases the responsibility for determining compliance with the Building Regulations remains with the building control
body concerned.
This guidance note is based upon information available at the time of issue and may be subject to change. The Approved
Documents should be consulted for full details in any particular case.

UNSPECIFIED

ce marking

UNSPECIFIED Para:BS ISO 3864-1:2011 Graphical symbols. Safety colours and safety signs Design principles for safety signs and safety markings

Establishes the safety identification colours and design principles for safety signs and safety markings used in work places and public areas.

UNSPECIFIED

client

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 2 - Protected Entrance Halls

BCA technical guidance notes are for the benefit of it’s members and the construction industry, to provide information, promote
good practice and encourage consistency of interpretation for the benefit of our clients. They are advisory in nature,
and in all cases the responsibility for determining compliance with the Building Regulations remains with the building control
body concerned.
This guidance note is based upon information available at the time of issue and may be subject to change. The Approved
Documents should be consulted for full details in any particular case.

UNSPECIFIED

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 2 - Protected Entrance Halls

BCA technical guidance notes are for the benefit of it’s members and the construction industry, to provide information, promote
good practice and encourage consistency of interpretation for the benefit of our clients. They are advisory in nature,
and in all cases the responsibility for determining compliance with the Building Regulations remains with the building control
body concerned.
This guidance note is based upon information available at the time of issue and may be subject to change. The Approved
Documents should be consulted for full details in any particular case.

UNSPECIFIED

commissioning

UNSPECIFIED Para:BS 2782-0:2011 Methods of testing plastic

Provides a general introduction to methods of test for plastics and covers, content and usage of BS 2782, units, apparatus and reagents, sampling, number and preparation of test pieces, direction of testing and the test report

UNSPECIFIED

UNSPECIFIED Para:BS 5839-9:2011 Fire detection and fire alarm systems for buildings. Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems

Recommendations are given for planning, design, installation, commissioning and maintenance of emergency voice communication (EVC) systems in and around buildings and at sports, entertainment and similar venues.

UNSPECIFIED

UNSPECIFIED Para:BS 8313:1997 Components for residential sprinkler systems - specification and test methods for residential sprinklers

Gives construction and performance requirements and test methods for sprinklers operated by change of state of an element or bursting of a glass bulb under the influence of heat.

UNSPECIFIED

construction

UNSPECIFIED Para:BS 8313:1997 Components for residential sprinkler systems - specification and test methods for residential sprinklers

Gives construction and performance requirements and test methods for sprinklers operated by change of state of an element or bursting of a glass bulb under the influence of heat.

UNSPECIFIED

construction operative

UNSPECIFIED Para:BS 8313:1997 Components for residential sprinkler systems - specification and test methods for residential sprinklers

Gives construction and performance requirements and test methods for sprinklers operated by change of state of an element or bursting of a glass bulb under the influence of heat.

UNSPECIFIED

design and build

UNSPECIFIED Para:BS 5839-9:2011 Fire detection and fire alarm systems for buildings. Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems

Recommendations are given for planning, design, installation, commissioning and maintenance of emergency voice communication (EVC) systems in and around buildings and at sports, entertainment and similar venues.

UNSPECIFIED

designation system

UNSPECIFIED Para:BS 5839-9:2011 Fire detection and fire alarm systems for buildings. Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems

Recommendations are given for planning, design, installation, commissioning and maintenance of emergency voice communication (EVC) systems in and around buildings and at sports, entertainment and similar venues.

UNSPECIFIED

designer

UNSPECIFIED Para:BS ISO 3864-1:2011 Graphical symbols. Safety colours and safety signs Design principles for safety signs and safety markings

Establishes the safety identification colours and design principles for safety signs and safety markings used in work places and public areas.

UNSPECIFIED

earth-closet

UNSPECIFIED Para:BS 2782-0:2011 Methods of testing plastic

Provides a general introduction to methods of test for plastics and covers, content and usage of BS 2782, units, apparatus and reagents, sampling, number and preparation of test pieces, direction of testing and the test report

UNSPECIFIED

framed wall

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 10 - Installation of boiler flues and ventilation perforations in external timber framed walls

Boiler flues have been a subject of discussion in the last few years, primarily due to issues raised within CORGI`s technical bulletin 200 which addresses some aspects of the installation of room sealed flue systems within voids. Whilst this provides for the access and inspection of flues inspecting officers form public and private sectors have noted that there appears to be a lack of knowledge by site operatives etc. in the installation of boiler flues and other ducted ventilation perforations within timber frame buildings.

Any perforation within the external walls of a timber frame building need to take into account the relevant requirements of Parts B, C, J & L. It has been discovered that in the majority of cases, appropriate installation instructions are not provided or highlighted within installation or manufacturers manuals/guidance to address timber framed buildings. This has created a “custom and practice” approach by installers which generally does not comply with the goals required in the above mentioned Parts of the Building Regulations and in some cases miss the provisions altogether leaving dangerous conditions, latent defects or both.

UNSPECIFIED

general

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 10 - Installation of boiler flues and ventilation perforations in external timber framed walls

Boiler flues have been a subject of discussion in the last few years, primarily due to issues raised within CORGI`s technical bulletin 200 which addresses some aspects of the installation of room sealed flue systems within voids. Whilst this provides for the access and inspection of flues inspecting officers form public and private sectors have noted that there appears to be a lack of knowledge by site operatives etc. in the installation of boiler flues and other ducted ventilation perforations within timber frame buildings.

Any perforation within the external walls of a timber frame building need to take into account the relevant requirements of Parts B, C, J & L. It has been discovered that in the majority of cases, appropriate installation instructions are not provided or highlighted within installation or manufacturers manuals/guidance to address timber framed buildings. This has created a “custom and practice” approach by installers which generally does not comply with the goals required in the above mentioned Parts of the Building Regulations and in some cases miss the provisions altogether leaving dangerous conditions, latent defects or both.

UNSPECIFIED

UNSPECIFIED Para:BS 2782-0:2011 Methods of testing plastic

Provides a general introduction to methods of test for plastics and covers, content and usage of BS 2782, units, apparatus and reagents, sampling, number and preparation of test pieces, direction of testing and the test report

UNSPECIFIED

installation instructions

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 10 - Installation of boiler flues and ventilation perforations in external timber framed walls

Boiler flues have been a subject of discussion in the last few years, primarily due to issues raised within CORGI`s technical bulletin 200 which addresses some aspects of the installation of room sealed flue systems within voids. Whilst this provides for the access and inspection of flues inspecting officers form public and private sectors have noted that there appears to be a lack of knowledge by site operatives etc. in the installation of boiler flues and other ducted ventilation perforations within timber frame buildings.

Any perforation within the external walls of a timber frame building need to take into account the relevant requirements of Parts B, C, J & L. It has been discovered that in the majority of cases, appropriate installation instructions are not provided or highlighted within installation or manufacturers manuals/guidance to address timber framed buildings. This has created a “custom and practice” approach by installers which generally does not comply with the goals required in the above mentioned Parts of the Building Regulations and in some cases miss the provisions altogether leaving dangerous conditions, latent defects or both.

UNSPECIFIED

instruction

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 10 - Installation of boiler flues and ventilation perforations in external timber framed walls

Boiler flues have been a subject of discussion in the last few years, primarily due to issues raised within CORGI`s technical bulletin 200 which addresses some aspects of the installation of room sealed flue systems within voids. Whilst this provides for the access and inspection of flues inspecting officers form public and private sectors have noted that there appears to be a lack of knowledge by site operatives etc. in the installation of boiler flues and other ducted ventilation perforations within timber frame buildings.

Any perforation within the external walls of a timber frame building need to take into account the relevant requirements of Parts B, C, J & L. It has been discovered that in the majority of cases, appropriate installation instructions are not provided or highlighted within installation or manufacturers manuals/guidance to address timber framed buildings. This has created a “custom and practice” approach by installers which generally does not comply with the goals required in the above mentioned Parts of the Building Regulations and in some cases miss the provisions altogether leaving dangerous conditions, latent defects or both.

UNSPECIFIED

introduction

UNSPECIFIED Para:BS 2782-0:2011 Methods of testing plastic

Provides a general introduction to methods of test for plastics and covers, content and usage of BS 2782, units, apparatus and reagents, sampling, number and preparation of test pieces, direction of testing and the test report

UNSPECIFIED

manufacturer

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 10 - Installation of boiler flues and ventilation perforations in external timber framed walls

Boiler flues have been a subject of discussion in the last few years, primarily due to issues raised within CORGI`s technical bulletin 200 which addresses some aspects of the installation of room sealed flue systems within voids. Whilst this provides for the access and inspection of flues inspecting officers form public and private sectors have noted that there appears to be a lack of knowledge by site operatives etc. in the installation of boiler flues and other ducted ventilation perforations within timber frame buildings.

Any perforation within the external walls of a timber frame building need to take into account the relevant requirements of Parts B, C, J & L. It has been discovered that in the majority of cases, appropriate installation instructions are not provided or highlighted within installation or manufacturers manuals/guidance to address timber framed buildings. This has created a “custom and practice” approach by installers which generally does not comply with the goals required in the above mentioned Parts of the Building Regulations and in some cases miss the provisions altogether leaving dangerous conditions, latent defects or both.

UNSPECIFIED

notified body

BCA UNSPECIFIED Para:- BCA Technical Guidance Note 2 - Protected Entrance Halls

BCA technical guidance notes are for the benefit of it’s members and the construction industry, to provide information, promote
good practice and encourage consistency of interpretation for the benefit of our clients. They are advisory in nature,
and in all cases the responsibility for determining compliance with the Building Regulations remains with the building control
body concerned.
This guidance note is based upon information available at the time of issue and may be subject to change. The Approved
Documents should be consulted for full details in any particular case.

UNSPECIFIED

operation

UNSPECIFIED Para:BS 8313:1997 Components for residential sprinkler systems - specification and test methods for residential sprinklers

Gives construction and performance requirements and test methods for sprinklers operated by change of state of an element or bursting of a glass bulb under the influence of heat.

UNSPECIFIED

report

UNSPECIFIED Para:BS 2782-0:2011 Methods of testing plastic

Provides a general introduction to methods of test for plastics and covers, content and usage of BS 2782, units, apparatus and reagents, sampling, number and preparation of test pieces, direction of testing and the test report

UNSPECIFIED

This list was generated on Mon Nov 18 04:44:35 2024 UTC.