ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

boundary

ADB1 2020 Para:11.5 Boundaries

The boundary that a wall faces is the relevant boundary (Diagram 11.2). It may be one of the following.
a. The site boundary.
b. The centre line of a space where further development is unlikely, such as a road, railway, canal or river.
c. An assumed notional boundary between two buildings on the same site (Diagram 11.3) where either of the following conditions is met.
i. One or both of the buildings are in the "residential" or "assembly and recreation" purpose groups (purpose group 1, 2 or 5).
ii. The buildings will be operated/managed by different organisations.

Department for Communities and Local Government, (2019) Boundaries. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 11: Resisting fire spread from one building to another, 1 (11.5). RIBA Publishing Publication, London, p. 83. ISBN 9781859469156

ADB1 2020 Para:11.5 Boundaries

The boundary that a wall faces is the relevant boundary (Diagram 11.2). It may be one of the following.
a. The site boundary.
b. The centre line of a space where further development is unlikely, such as a road, railway, canal or river.
c. An assumed notional boundary between two buildings on the same site (Diagram 11.3) where either of the following conditions is met.
i. One or both of the buildings are in the "residential" or "assembly and recreation" purpose groups (purpose group 1, 2 or 5).
ii. The buildings will be operated/managed by different organisations.

Department for Communities and Local Government, (2019) Boundaries. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 11: Resisting fire spread from one building to another, 1 (11.5). RIBA Publishing Publication, London, p. 83. ISBN 9781859469156

capacity

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

common stair

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

diagram d2 cubic capacity

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

diagram d3 area

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

direct distance

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

fire compartment

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

flat

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

floor 01

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

floor 02

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

ground floor

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

internal wall

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

landing

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

measurement

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

notional boundary

ADB1 2020 Para:11.5 Boundaries

The boundary that a wall faces is the relevant boundary (Diagram 11.2). It may be one of the following.
a. The site boundary.
b. The centre line of a space where further development is unlikely, such as a road, railway, canal or river.
c. An assumed notional boundary between two buildings on the same site (Diagram 11.3) where either of the following conditions is met.
i. One or both of the buildings are in the "residential" or "assembly and recreation" purpose groups (purpose group 1, 2 or 5).
ii. The buildings will be operated/managed by different organisations.

Department for Communities and Local Government, (2019) Boundaries. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 11: Resisting fire spread from one building to another, 1 (11.5). RIBA Publishing Publication, London, p. 83. ISBN 9781859469156

purpose group

ADB1 2020 Para:11.5 Boundaries

The boundary that a wall faces is the relevant boundary (Diagram 11.2). It may be one of the following.
a. The site boundary.
b. The centre line of a space where further development is unlikely, such as a road, railway, canal or river.
c. An assumed notional boundary between two buildings on the same site (Diagram 11.3) where either of the following conditions is met.
i. One or both of the buildings are in the "residential" or "assembly and recreation" purpose groups (purpose group 1, 2 or 5).
ii. The buildings will be operated/managed by different organisations.

Department for Communities and Local Government, (2019) Boundaries. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 11: Resisting fire spread from one building to another, 1 (11.5). RIBA Publishing Publication, London, p. 83. ISBN 9781859469156

relevant boundary

ADB1 2020 Para:11.5 Boundaries

The boundary that a wall faces is the relevant boundary (Diagram 11.2). It may be one of the following.
a. The site boundary.
b. The centre line of a space where further development is unlikely, such as a road, railway, canal or river.
c. An assumed notional boundary between two buildings on the same site (Diagram 11.3) where either of the following conditions is met.
i. One or both of the buildings are in the "residential" or "assembly and recreation" purpose groups (purpose group 1, 2 or 5).
ii. The buildings will be operated/managed by different organisations.

Department for Communities and Local Government, (2019) Boundaries. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 11: Resisting fire spread from one building to another, 1 (11.5). RIBA Publishing Publication, London, p. 83. ISBN 9781859469156

separated part

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

should

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

storey

ADB1 2020 Para:15.13 Wayfinding signage for the fire service

To assist the fire service to identify each floor in a block of flats with a top storey more than 11m above ground level (see Diagram D6), floor identification signs and flat indicator signs should be provided.

UNSPECIFIED

ADB1 2020 Para:7.4 Sprinklers

Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.

Department for Communities and Local Government, (2019) Sprinklers. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 7: Compartmentation/sprinklers – flats, 1 (7.4). RIBA Publishing Publication, London, p. 59. ISBN 9781859469156

volume

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

wall

ADB1 UNSPECIFIED Para:UNSPECIFIED Diagram D2 Cubic capacity

In every case measure the volume contained by all of the following.
a. Under surface of roof.
b. Upper surface of lowest floor.
c. Inner surface of enclosing walls.
When there is not an outer enclosingwall, measure to the outermost edge of the floor slab.
The measured volume should include internal walls and partitions.
a. Cubic capacity of a building Internal wall or partition
b. Cubic capacity of compartments or separated part of a building
Diagram D2 Cubic capacity

UNSPECIFIED

This list was generated on Sat Dec 21 16:18:43 2024 UTC.