Department for Communities and Local Government, (2019) Junction of compartment wall with roof. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 5: Internal fire spread – dwellinghouses, 1 (5.13). RIBA Publishing Publication, London, p. 52. ISBN 9781859469156
Full text not available from this repository.
Official URL: https://www.gov.uk/government/publications/fire-sa...
Abstract
Materials achieving class B-s3, d2 or worse used as a substrate to the roof covering and any timber tiling battens, fully bedded in mortar or other suitable material for the width of the wall (Diagram 5.2b), may extend over the compartment wall in buildings that are a maximum of 15m high.
Item Type: | Book Section |
---|---|
Additional Information: | mml-maui-text-analytics-keywords |
Uncontrolled Keywords: | compartment wall, suitable, wall, roof, bs 8895-2:2015 material, unprotected area, materials |
Subjects: | Section 05: Internal fire spread – dwellinghouses B3: Internal fire spread (structure) Building standards |
Date Deposited: | 15 Feb 2020 06:06 |
Last Modified: | 29 Sep 2022 21:02 |
URI: | https://buildvoc.co.uk/id/eprint/476 |