Design and construction of firefighting shafts

Department for Communities and Local Government, (2019) Design and construction of firefighting shafts. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 15: Access to buildings for firefighting personnel – flats, 1 (15.11). RIBA Publishing Publication, London, p. 105. ISBN 9781859469156

Full text not available from this repository.

Abstract

A firefighting lift installation includes all of the following.
a. Lift car.
b. Lift well.
c. Lift machinery space.
d. Lift control system.
e. Lift communications system.
The lift shaft should be constructed in accordance with Section 6 of BS 9999.
Firefighting lift installations should conform to BS EN 81-72 and BS EN 81-20.

Item Type: Book Section
Additional Information: mml-maui-text-analytics-keywords
Uncontrolled Keywords: firefighting lift, firefighting lift
Subjects: Section 15: Access to buildings for firefighting personnel – flats
B5: Access and facilities for the fire service
Building standards
Date Deposited: 28 Feb 2020 21:02
Last Modified: 29 Sep 2022 21:01
URI: https://buildvoc.co.uk/id/eprint/821

Actions (login required)

View Item
View Item