Diagram 9.2 Pipes penetrating structure

Department for Communities and Local Government, (2019) Diagram 9.2 Pipes penetrating structure. [Image]

[img]
Preview
Image
b-volume-1-diagram-9-2-pipes-penetrating-structure.jpg

Download (188kB) | Preview
[img] Image
b-volume-1-diagram-9-2-pipes-penetrating-structure.svg

Download (12kB)
[img] Text
b-volume-1-diagram-9-2-pipes-penetrating-structure.docx
Restricted to Repository staff only

Download (8kB)
[img] Text (Plain text conversion conversion from text to text/plain)
b-volume-1-diagram-9-2-pipes-penetrating-structure.txt
Restricted to Repository staff only

Download (392B)
[img] Text
887.json

Download (1kB)

Abstract

NOTES:
1.Make the opening in the structure as small as possible and provide fire-stopping between pipe and structure.
2.See Table 9.1 for materials specification.
3. The sleeve should be class A1 rated.
See para 9.5

Item Type: Image
Additional Information: mml-maui-text-analytics-keywords
Uncontrolled Keywords: fire-stop (Fire-stopping), pipe
Subjects: B3: Internal fire spread (structure)
Section 09: Protection of openings and fire‑stopping
Building standards
Date Deposited: 04 Mar 2020 22:18
Last Modified: 29 Sep 2022 21:01
URI: https://buildvoc.co.uk/id/eprint/887

Actions (login required)

View Item
View Item